Construction sourcing, quick answers

What construction products does GSN source?
Structural steel sections, brackets, cleats, gussets, base plates, purlins, fixings, anchors, cast-in items, formwork hardware, scaffold components, safety mesh, site enclosures and temporary works fabrications.
Do parts meet Australian Standards?
Structural steel is sourced against AS/NZS 3679 with mill certificates. Welded fabrication to AS/NZS 1554. Hot-dip galvanising to AS/NZS 4680. Fixings and anchors to the relevant AS specification. Documentation supplied with each shipment.
Can you handle project-specific short runs?
Yes. Project fabrications, one-off brackets and site-specific weldments are routinely handled through the network or pulled onshore to McIver Engineering in Sydney if the site deadline demands it.
What finishes are standard?
Hot-dip galvanising, zinc plating, powder coat (RAL and Interpon), wet paint systems for infrastructure (Class 2, Class 3 durability), and duplex coatings for coastal or high-corrosion environments.

/ Industries / Construction

Construction Products
Sourcing.

For Australian construction product brands, builders and infrastructure suppliers. Structural steel, brackets, fixings, formwork hardware, site enclosures, sourced overseas and delivered against Australian Standards.

/ Typical parts

Structural sections, brackets, cleats, gussets, base plates, purlins, cast-in ferrules and anchors, formwork props and hardware, scaffold components, safety mesh, site enclosures, hoardings and temporary works fabrications.

Standards & documentation.

Structural steel to AS/NZS 3679 with mill certificates. Welded fabrication inspected to AS/NZS 1554. Galvanising to AS/NZS 4680 with film thickness data. Fixings supplied against the relevant AS spec. Compliance documentation ships with the goods.

Onshore for site-critical items.

Site-specific brackets, one-off weldments and urgent make-good items go through McIver Engineering in Sydney when the program cannot wait for freight.

Project brief?

Send the drawing set, quantities and site date.

Start the brief →